Highways & Motorways Project

Sr. No. Project Name Client Job Description CSMS Fee
1 Consultancy Services for Detailed Design Of Lahore Ring Road FWO (Frontier Works Organization) • Geometric design of 22Km Six lane motorway including design of 6 interchanges.
• Structural design of 11 bridges on interchanges, streams and canals.
• Design of box culverts, pipe culverts, box culverts for flood passage, vehicular subways, pedestrian subways, NJB, retaining walls and concrete drains.
• Design of drainage & erosion control works.
• Design of service roads, ancillary works, oll plazas and weight stations.
11.96 Million Rs.
2 Topographic Survey of Khuzdar ~ Quetta ~ Chaman Highway (Section N-25) Balochistan National Engineering Services Pakistan (Pvt.) Ltd (NESPAK) • Topographic Survey of Khuzdra ~ Quetta ~ Chaman Highway Total length of 415 Km, including X-Sections of roads, survey of structures, Bridges & Pipe culverts etc.
• Detailed Design for Dualization of Khuzdar ~ Quetta ~ Chaman Section of N-25 Along with the Technical Study & detail design of alternative route at Lakpass & Tunnel at Khojak Bypass
3.71 Million Rs.
3 Dasu Hydropower Project (Right Bank Access Road (RAR -2 & RAR-3)) (Pakistan) Dasu Hydropower Consultants (DHC) • Topographic Survey of 2400 Acre of Hydropower Project at various scales & Tunnel Alignment.
• Construction of Different Survey Stations No 45.
• Establishment of Horizontal & Vertical Control of 90Km Area.
• Setting out of Center Line Area 45Km.
• Assistance in Geological Mapping
5.90 Million Rs.
4 Topographic Survey Of Lahore– Sialkot Motorway (96 Km) FWO (Frontier Works Organization) • Topographic Survey of Lahore– Sialkot Motorway Total length of 96 Km, including X-Sections of roads, survey of structures, Bridges & Pipe culverts etc. 5.80 Million Rs.
5 Topographic Survey Of Basima – Khuzdar Highway (N-30) Section - 1 (KM 0 TO KM 55) & Section -2 (KM 55 TO KM 110) National Engineering Services Pakistan (Pvt.) Ltd (NESPAK) • Topographic Survey of Basima – Khuzdar Highway Total length of 110 Km, including X-Sections of roads, survey of structures, Bridges & Pipe culverts etc. 4.48 Million Rs.
6 Karachi – Lahore Motorway
Topographic survey of Abdul Hakeem – Lahore Section
Asif Ali Associates (Pvt.) Ltd.(AAA) • Layout of center line @ 100m interval
• Cross sections survey of 100m wide strip @250m interval
• Installation of survey control points at suitable interval
• Verification/ up-dating of main features from Google-Earth Image
• Installation of BM monuments, 30cmx30cm top, 45cmx45cm at bottom, 45cm high at 10km interval. Such that 30cm are in ground and 15cm above ground.
• Survey with Trimble 5800 DGPS to provide precise 3D value in WGS-84 datum
• Topographic survey of Flyovers, Service Areas and Interchanges
4.5 Million Rs.
7 Topographic Survey Of Chitral – Shandoor Highway (153 Km) Asif Ali Associates (Pvt.) Ltd.(AAA) • Topographic Survey of Chitral– Shandoor Highway Total length of 153 Km, including X-Sections of roads, survey of structures, Bridges & Pipe culverts etc. 4.00 Million Rs.
8 Topographic Survey of National Trade Corridor N-5 & N-55 (Pakistan) National Highway Authority • Topographic Survey of 145 km long road sections at 1:1000 R.Y.Khan~TMP Section of N-5 & Ratodero~Shikarpur Section of N-55 3.03 Million Rs.
9 Dasu Hydropower Project (Right Bank Access Road (RAR -4) (Pakistan) Dasu Hydropower Consultants (DHC) • Topographic Survey of 1100 Acre of Hydropower Project at various scales.
• Construction of Different Survey Stations No 26.
• Establishment of Horizontal & Vertical Control of 26Km Area.
• Setting out of Center Line Area 26Km.
Assistance in Geological Mapping.
2.9 Million Rs.
10 Boundary Demarcation & Topographic Survey Of Solar Power Plant site at Chakwal Saddiqsons Energy Limited (Karachi) • Topographic Survey of the Plant Site around 4,800 Kanals.
• Construction of Different Survey Stations No 87.
• Establishment of Horizontal & Vertical Control of Project Area.
• Survey of about 13 kilometer long access road will be conducted for 150ft wide corridor
2.2 Million Rs.
11 130 MW Sehra Hydro Power Project Azad Kashmir Tamavan Consulting Engineering • Purchase of Worldview Stereo Pair Image 0.5m resolution.
• Identification of GCP’s.
• Collection of GCP’s.
• Topographic Survey of River portion.
• Image Post-processing & DEM Generation.
• Layout and vertical profile of designed road alignment at 20m interval.
1.27 Million Rs.
12 Traverse & Layout of Roads, Zhobe, Muzaffargarh, & Jakobabad Asif Ali Associates (Pvt.) Ltd.(AAA) • Checking Layout of 3 National Highways in Punjab, Sindh and Balochistan province 0.70 Million Rs.
13 Row Demarcation For Lahore Eastern Bypass Asif Ali Associates (Pvt.) Ltd. (AAA) • ROW demarcation for Lahore Eastern Bypass Kala-Shah Kaku To Mahmood Booti Total Length 30Km
• Layout of 30 Km long road & Interchanges for land acuzition
0.35 Million Rs.
14 ADB Assisted Roads Project Malakend-III ADB, Govt. of NWFP Job Description • Topographic Survey of 29 Km long hilly roads 0.31 Million Rs.
15 Topographic Survey of 6Km Model Town Road Euroconsult Pakistan (Pvt.) Ltd. Lahore • Topographic Survey of Model Town road (6 Km) Lahore 0.07 Million Rs.
16 Check Survey for ECSP Engineering Consulting Services for Punjab (Pvt.) Ltd. • Survey services for different roads 0.22 Million Rs.
17 Surveying Services for G3 Consulting & Engineering G3 Consulting & Engineering (Pvt.) Ltd. • Mapping of Chung and Ferozewala Towns total area 2500 acres 0.15 Million Rs.